LST Test Ferrara



11/08/2003 First signals from wires and strips.
  • Some examples with strip down
  • Some examples with strip up

  • 02/05/2003 More on plateau curves and spectra by Gigi.

  • 01/29/2003 Status of a prototype from Pol.hi.tech
  • .

    02/05/2003 We made a mapping of the two high resistivity profiles from Pol.hi.tech.
  • Profile 1
  • Profile 2

  • 02/06/2003 LST gas system
  • Check of Mass Flow Meters
  • .

    02/12/2003 Open High Resistivity profile from Pol.hi.tech.
  • some pictures
  • .

    02/24/2003 Measurements of the distances between wire and cathode for HR profile:
  • Wire 3 profile 1
  • .

    02/27/2003 Voltages and currents versus time for some chambers:
  • See plot
  • .

    03/12/2003 New measurements of the distances between wire and cathode for HR profile:
  • All 8 wires
  • .
  • Correlation between distances and rate
  • .

  • Go Home